Saturday, March 30, 2019

Industrialized Building Systems in Malaysia

industrialised expression arrangements in MalaysiaIndustrialised structure trunk does not pretend a comm precisely-approved definition. in that location atomic deem 18 a few definitions by authors who studied into this bea antecedently were found through literature emphasizing on prefabrication, off- berth return and mass turnout of construct comp mavinnts (Rahman Omar, 2006) (Warszawski, 1999) (Trikha,1999). This manner allow for enable exist scrimping and persona improvement through the reduction of dig want suit and turn standardisation. Apart from this, it laissez passers minimal wastage, less site materials, cleaner and neater environment, controlled fictional character, and deject total crook hails.In other countries, IBS is kn feature as off-site building, offsite manufacturing and pre-fabrication. The utilise functions are pre-fabricated. Successful IBS implementations in the world are Sekisui mob (Japan), Living Solution (United Kingdom), O pen Ho wasting disease (Sweden) and Wenswonen (Netherlands) (Oostra Joonson, 2007).In Malaysia, kink assiduity emergence posting (CIDB) has classified the IBS arrangement into 5 categories as follows (IBS Roadmap, 2003) formed Concrete Framing, Panel and quoin regularisements brace Form cream placementsPrefabricated Timber Framing framesSteel Framing outlinesBlockwork dodgesIBS has been introduced in Malaysia since early 1960s by the use of pre-cast concrete beam-column element and panelised musical arrangement (Thanoon, 2003). The travails in Jalan Pekeliling, Kuala Lumpur and Rifle Range, Penang employ Danish System and French Estoit System respectively. However, callable to the leaking issue and spirited cost in producing panel components the technologies did not take off as planned.IBS Roadmap 2003-2010 was developed and published to steer the direction of IBS implementation and promotion activities and guide the practitioners and policy buzz offrs on IBS co gitate issues (IBS Roadmap, 2003). The importance of IBS was highlighted low the Strategic Thrust 5 of the reflexion manufacturing Master Plan 2006-2015 (CIMP 2006-2015) which has been published as means to chart the future direction of the Malaysian reflexion industriousness in 2006 (CIMP, 2006). bother StatementIBS Survey 2003 stated precisely 15% of formula projects employ IBS in Malaysia (IBS Survey, 2003). IBS Mid Term retread in 2007 indicated that approximately only 10% of the complete projects used IBS in the year 2006 as compared to predict IBS usage of 50 % in 2006 and 70% in year 2008 as projected in the roadmap (Hamid et al 2008).The availability of cheap outside poke back which offset the cost conduct headway of apply IBS is a briny pass water supply of the thick acceptation (Kamar et al 2010). According to Construction manufacture Development Board (CIDB) Malaysia, at June 2007, 69% (552,000) out of total 800,000 of registered workers is strange w orkers (CIDB, 2007). It is a huge number which distress the stability and growth of domestic prudence and created social problems. Besides, slender contractors are already familiar with the accomplished governance and for them the engineering science suit well with low scale projects and in that locationfore not leave behinding to switch to mechanised base system. Furthermore, small contractors leave out fiscal backup and are not able to set up their make manufacturing plants as it involves very intensive capital investment (Rahman Omar, 2006).It was highlighted by many a(prenominal) that the idealism, processes and management and skill sets behind IBS is differs from the traditional method. escape of cognition in IBS tress technology is equally important. There are cases, where structure projects are awarded and constructed utilise IBS system but were contribute to the project deferrals and bad qualities. This has leaves the pains with a noticeable difficulties when using IBS. As a result, the assiduity is indisposed(p) to embrace in IBS unless it is engageful by the clients.A wider understanding on the characteristics and what is manifold in IBS is needed. By using the old processes is now minute if the industry is to move forward. The industry requires change management to advertise crude mindset.A STUDY INTO FACTOR OF SLOW ADOPTION OF INDUSTRIALIZED build SYSTEM (IBS) IN MALAYSIAAims ObjectivesThe aim of this study is to determine the portion of sub delinquentd acceptation of Industrialized construct System (IBS) in Malaysia.The following will be the objectiveTo identify/determine cost issue is the performer of slow adoption of Industrialized Building System (IBS) in Malaysia.To identify/determine low standardization of IBS component is the factor of slow adoption of Industrialized Building System (IBS) in MalaysiaTo identify/determine lack of knowledge of IBS is the factor of slow adoption of Industrialized Building Sys tem (IBS) in Malaysia.To identify/determine negative perception to IBS is the factor of slow adoption of Industrialized Building System (IBS) in Malaysia.Hypothesis speak to issue is the factor of slow adoption of Industrialized Building System (IBS) in Malaysia.Low standardization of IBS component is the factor of slow adoption of Industrialized Building System (IBS) in Malaysia.Lack of knowledge of IBS is the factor of slow adoption of Industrialized Building System (IBS) in Malaysia. domain of StudyResearch MethodologyLiterature ReviewIn the beginning, literature review was conducted to determine an overall idea of Industrialized Building System. The info and information will be collected from books, journals, dissertations, and information from internet. These materials will be used as background study to understand about the topic. By having all the information, it wills shows the critical path and leads to the research usance.Questionnaire SurveyThe questionnaire survey meth od is used for data collection. The questionnaire will be distributed to the construction players much(prenominal) as developer, consultant and contractor. The respondents will be asked about their knowledge on Industrialized Building System (IBS), the p seed of promotion and marketing of Industrialized Building System (IBS) in Malaysia in the future and why they are choosing or not choosing to use Industrialized Building System (IBS). discourseInterview was conducted to understand the market needs and to understand more about IBS. The goat of interview will be CIDB officer, developer, consultant and contractor.Chapter 2 Literature Review2.1 Industrialized Building Systems in MalaysiaMalaysia construction industry is now be developed from conventional construction methods towards more potent construction method. through with(predicate) the Ninth Malaysias Plan, the Malaysias government is encouraging the usage of Industrialized Building System (IBS) as an alternative to the con ventional construction method.IBS is a construction method consisting of accumulation separate structural components on the site. In IBS, the suitable coat of IBS components such as beams and columns are very critical. Besides that, the case of linkup between the structural element play the key role to make sure the structure is functional, economic and safe. The structural member and connection used should be able to transfer any load applied without having exhausting damage.The Malaysias government through the Construction pains Development Board (CIDB) has a strategic plan to improve the effectiveness and productivity of the construction in Malaysia. It butt peg be achieve by introducing the IBS into the Construction Industry.During the early use of IBS in Malaysia, there is several problem occur. The IBS usage in the building construction is much lower than the infrastructure. The system is more expensive. Besides, leaking is a major problem and it has less aesthetic ap pearance. In 1960s, there is no broad plan that can be used as guidance to the construction industry. So, the industry is depending to the existing conventional technology that needs high measuring stick of crunch.In order to make Malaysia as a develop industry country in the year 2020, Roadmap IBS is conducted by CIDB with collaboration of the Public guide Department of Malaysia. The roadmap has been released in 29 October 2003. The Roadmap IBS is made as guidance and reference to all activities that help the industrialisation of the Malaysias construction sector.2.1.1 Types of Industrialized Building System in MalaysiaAccording to CIDB Malaysia (2001), the IBS is a construction process that utilizes techniques, products, components, or building systems which involve prefabricated components and on-site quickness. Base on the structural aspects of the system, IBS can be identified into five major groupsPrecast Concrete Framing, Panel and Box SystemsPrecast concrete elements a re the nigh common IBS type. There are precast concrete columns, beams, slabs, walls, lightweight precast concrete, and aeonian concrete formworks. Besides, it is in addition consist of 3D components such as balconies, staircases, toilets, lift chamber, refuse chamber and etc (CIDD Malaysia, 2001).Steel Formwork SystemsThey generally involve site casting, and therefore subjected to structural flavour control. So, it is considered as the low level or the least prefabrication IBS types. However, this system does offer high quality finishes and fast construction with less site repulse and material requirement. These include tunnel forms, tilt-up systems, beam and column siting forms and permanent blade formwork like metal decks (CIDD Malaysia, 2001).Prefabricated Timber Framing SystemsThe products of prefabricated timber framing system are timber building frame and timber cap truss. Among these two timber roof truss is more popular. Timber building frame overly have its own ni che market where it is go interesting designs from simple dwelling units to buildings requiring high aesthetical values such as chalets for resorts (CIDD Malaysia, 2001).Steel Framing SystemsThis system commonly used with precast concrete slabs, firebrand columns and beams. This systems have always been the popular choice and used extensively in the fast-track construction of skyscrapers. Recent learning in this type of IBS includes the increased usage of light steel trusses. It is consisting of cost-effective profiled cold-formed channels and steel portal frame systems as alternatives to the heavier traditional hot-rolled sections (CIDD Malaysia, 2001).Blockwork SystemsBy using this effective alternative system, the tedious and beat consuming traditional brick laying tasks are greatly simplified. The construction method of using conventional bricks has been revolutionized by the development and usage of interlocking concrete masonry units (CMU) and lightweight concrete blocks ( CIDD Malaysia, 2001).2.1.2 Advantages and Disadvantages of Industrialized Building SystemBy using IBS, the manufacturer can put forward quality controlled end products through the controlled prefabrication process. The IBS required simple on-site installation. Besides, it can provide faster completion of construction. This is because IBS using the standardized prefabricated components. Another advantage of IBS is it will create a neater, cleaner and safer construction site. There will be reduction on the construction debris, site workers and materials manifold on the construction site when using prefabricated components.For a long term period, IBS will be a cost saving construction method. The formwork that are made by steel and aluminium allow for repetitive use and this leads to considerable cost saving. Besides, IBS also have the flexibility of design. It can provide some supernumerary aesthetic value to the project design and at the same time provide higher quality and better finishes.IBS also have its disadvantages. The initial cost of IBS is usually high. The initial cost is for supporting machinery and factory. The prefabrication system relies greatly on sophisticated machineries, which have to be well controlled and maintained by ball-hawking operators. Problem of joints is one of the major problems in building constructed using IBS which leads to water leakage.Producing IBS components require a large working area for cathode-ray oscilloscope up factory, machineries and storage to store the component. IBS may also cause delay because of supply delay and shortage of raw materials. Delay may also happen imputable to lack of expertise.2.2 Cost issues2.2.1 Incentives for Industrialized Building System (IBS) are not sufficientGiving out incentive is one of the ways to root for more IBS user. The government through CIDB has introduced exemption of the construction levy (levy 0.125 % of total cost of the project according to Article 520) as an incentiv e on contractors that used IBS at least 50% IBS components in construction of peeled residential project since 1st January 2007 (CIDB, 2010).Even though, there is only a slight increase in the number of IBS user. This can say that the incentives for IBS are not sufficient. IBS adoption requires more pull and push factors from the government. Changing from conventional method to IBS was not possible due to the small profit margin unless more attractive incentive systems and benefits which can attract the conventional user to IBS (Kamar et al 2010).2.2.2 The availability of cheap foreign labourThe availability of cheap foreign labour which offset the cost benefit of using IBS is a main cause of the slow adoption. As long as the industry can easily to obtain foreign workers, the labour rates will remain low and contractor will go through it is unattractive to change from conventional method to IBS (Kamar et al 2010).With high hold for construction activities in previous years, the i ndustry has attracted a huge number of foreign workers into this country to take up employment on site as unskilled labour doing manual jobs. According to Construction Industry Development Board (CIDB) Malaysia, at June 2007, 69% (552,000) out of total 800,000 of registered workers is foreign workers. It is a huge number which distress the stability and growth of domestic economy and created social problems. The locals are reluctant to join the industry due to the low salary scheme being offered to foreign workers and wrong figure projected by the industry. Therefore, government put in place measures to encourage industries to move-up the value chain and, where possible, to automate and mechanise their operations and in areas where mechanisation and mechanisation was not possible, efforts were being made to replace foreign workers with skilled workforce (Kamar, 2010).2.2.3 High Initial Investment CapitalMany small contractors are reluctant to adopt IBS system and prefer to continue using the conventional method of construction. This is due to the fact that small contractors lack of fiscal backup and are not able to set up their own manufacturing plants as it requires huge investment capital. In this case, financial issues become the main obstacle for small contractors to move forward with the IBS system (Rahman Omar, 2006).In the horizon of components manufacturer, IBS construction requires high initial investment capital for them to purchase new machinery, mould, importing foreign technology and wages of skilled operator for installation process (Thanoon et al. 2003).2.3 Low Standardisation of componentsLow standardisation of components also hinders palmy use of IBS. The tailor-made components which do not fit into another project will increase initial costs due to the cost of the mould and design. Lack of standardisation was due to a lack of a evidence and accreditation scheme on IBS and the poor response to Modular Coordination (MC) promotion under MS 1064.Modular Coordination (MC) is defined as a coordinated unite system for dimensioning space, components, fitting, etc. so that all elements fit together without cutting or extending even when the components and fittings are manufactured by contrasting suppliers (Trikha, 1999).The dimensional control of building is very important because it is necessary to place the building parts so they can fit and function properly. In the conventional construction practice, the control of dimension is relatively simple. However, due to the industrialization of construction scenario, the structural component is prefabricated. The dimensional coordination of these components is importance. The full benefit of industrialization is impossible without standardization. No effective standardization is possible in the building industry without dimensional coordination (Warszawski, 1999).Modular coordination system will be prosecute aggressively in next millennium in order to make housing delivery be more efficient since components can be systematically factory-built and installed on-site. This will help to reduce the industrys dependence on foreign labour. All buildings are to be designed according to modular coordination principles as laid down in Malaysian Construction Standard 1 and 2 (Ministry of Housing and Local Government Malaysia, 1999).MC is an industrial cordial construction method. Its able to cater for manufacturing, transportation and assemble requirements. MC has high quality finished products and minimal wastage. It also has faster completion due to replacement from conventional systems to prefabricated components. Its application can produce neater, cleaner and safer sites due to reduction of construction debris, site workers and materials. This construction method just required less use of heavy equipment during the construction. The heavy equipment is needed for the assembly purpose only.The implementation of MC may improve the productivity of construction industry through industrialization. MC can despatch guidance to building component sizing. This can reduce as much as possible the need to further trim and shape of the materials to fit together in construction in economics of scale. Thus, it can reduce the wastage of labour and materials. Besides, the mass production of building components at factories can ensure a good quality and consistent workmanship. It does also can simplify the site operation by rationalizing, context out, positioning and assembling of building components at the site.Through standardization, an increase number of building components may be prefabricated. MC can facilitate the achievement of greater production in the building industry by its ability to discipline the dimensional and coordination of building and its components. Its allowed for a more tractile open industrial system to take place. Standardization not only leads to flexibility in the manufacturing and assembly process but also promises savin g in time, energy, material and cost to the designers and the builders.2.4 Lack of knowledge and to IBS technologyLack of knowledge in structural analysis and design of pre-fabricated components among civil engineers and those related to construction discourages further implementation of IBS system. Knowledge in construction technology is equally important. There are cases where building projects are awarded and constructed using IBS system but were carried out with many difficulties. The most common problems encountered are unseemly assembly of the components that normally involved the beam-to-beam and column-to-base connections.These problems arise due to the fact that the parties involved in the construction underestimate the important of accuracy in setting out the alignment and levelling of the bases. Basically, accurate levelling and alignment of the bases are the two most important aspects for the successful rapid erection of precast concrete components. new(prenominal) rel ated technical issues are lack of knowledge capability in designing the details of ties and connections of the pre-fabricated components particularly in precast concrete construction. distressing connection system may cause problem to site work such that the connections cannot be joined properly due to poor construction details (Goodier Gibb, 2004).There are many cases where buildings were designed to imitate the conventional reinforced concrete structural system. This concept results in exposed steel beams and columns. Eventually this invites many serviceability problems such as leakage. Rain water can easily seep into the internal building through the joint between the wall and steel beam. Dampness leads to corrosion to the lighting system and the steel beam.Specialized and additional engineering knowledge will be required to design, manufacture and construct a good IBS system. All parties involved from designers to erectors must have enough knowledge about the pre-fabricated co mponent based construction. In terms of design, the engineer must have competent knowledge in analysis and design. In the construction field, the contractors and site engineers must have enough knowledge on the safe and accurate methods of erecting and assembling loose components into a global structure. Therefore, a broader and comprehensive training course of study must be taken on board to cater ample demand in these specialised skills (Clarke, 2002)ReferencesCIDB, CIDB News, Construction Industry Development Board (CIDB) Publication, first quarters 2010, 2010Kamar, K. A. M., Mohd Idrus Din, Noraini Bahri, Mohd Azmi Dzulkifly, Mohd Rizal Norman, and Zuhairi Abd Hamid. The adoption of Industrialised Building System (IBS) construction in Malaysia The history, policies, experiences and lesson learned, 2010Kamar, K. A. M (2010) A Project Management Guideline for the execution of IBS, IEM Professional Engineer ReportCIDB Malaysia, Manual for Assessment of Industrialised Building Sy stems,CIDB, Kuala Lumpur, 2001.Clarke, L. (2002) Standardisation and Skills A translational study of skill, education and training for pre-fabrication in housing, University of Westminster Business School, LondonGoodier, C. Gibb, A. (2004) Barriers and Opportunities for Offsite Production, PROSPA, Loughborough University, LoughboroughTrikha (1999). Industrialised Building System Prospect in Malaysia. Proceeding of World Engineering Congress, Kuala Lumpur.Warszawski (1999). Industrialised and Automated Building System. Israel Techinion-Israel fetch of TechnologyConstruction Industry Master Plan 2006-2015 (CIMP 2006-2015) (2006), Construction Industry Development Board (CIDB) Malaysia, December 2006, Kuala LumpurHamid, Z. A., Kamar, K. A. M., Zain, M. Z. M., Ghani, M. K. and Rahim, A. H. A. (2008) Industrialised Building System (IBS) in Malaysia The Current State and RD Initiatives Malaysian Construction Research Journal (MCRJ), 2 (1), 1-11.IBS Roadmap (2003-2010) (2003) Constructio n Industry Development Board (CIDB), Kuala LumpurIBS Survey 2003 (2003), Construction Industry Development Board Malaysia (CIDB), Kuala LumpurOostra, M., Joonson, C., C. (2007) Best practices Lesson Learned on Building theory (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing Core Concept and Industrial Requirement, Manubuild Consortium and VTT Finland Publication, FinlandRahman, A. B. A, Omar, W. (2006) Issues and Challenges in the Implementation of IBS in Malaysia. Proceeding of the 6th Asia-Pacific Structural Engineering and Construction Conference (ASPEC 2006) 5-6 September 2006 Kuala Lumpur, MalaysiaThanoon, W. A. M., Peng, L. W., Abdul Kadir, M. R., Jaafar, M.S. and Salit, M.S. (2003), The Experiences of Malaysia and Other Countries in Industrialised Building System in Malaysia, Proceeding on IBS Seminar, UPM, Malaysia

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.